• Home
  • >
  • RESOURCES
  • >
  • The deal isn’t stalled. It’s waiting. Nobody knows for what.

The deal isn’t stalled. It’s waiting. Nobody knows for what.

Dan Vanrenen
June 30, 2026

The Slowdown Nobody Sees Coming

A live deal has twelve open items. Three of them are blocked, waiting on something external. One of those three is blocking the other two internally.

Nobody has mapped that dependency. The associate chasing item seven doesn't know it can't move until item four resolves. The partner asking for a status update hears "we're waiting on the adviser" without understanding that four other things are also sitting still behind it.

The deal isn't moving slowly because the team is slow. It's moving slowly because waiting is invisible.

Why Waiting Is the Default Bottleneck

Most deal teams are good at tracking what needs to be done. They are much weaker at tracking what is blocked and why.

Open item lists show tasks. They rarely show dependencies. They don't show which items are live, which are paused, and which are waiting on something outside the team's control. They don't show how long something has been waiting, or whether anyone has chased it.

The result is that blocked items sit quietly in the list alongside active ones. Progress looks slower than it is in places. It also looks faster than it is in others, because items that appear open are actually frozen.

By the time the partner identifies the real bottleneck, the timeline has already compressed.

What Cascading Delays Actually Cost

One blocked item holding up two others sounds manageable. Over a compressed diligence period, the maths changes quickly.

A data room section that hasn't arrived means the model can't be sensitised. The model delay pushes the IC memo. The IC memo delay compresses preparation time. Senior people who should be focused on the decision are instead managing a backlog that built up while everyone was waiting.

The cost isn't just time. It's the quality of the work that gets done under pressure at the end, and the decisions that get made with less preparation than they needed.

Building Visibility Into the Process

The fix is not more chasing. It is making the status of every open item legible without having to ask.

That means three things in practice.

  1. Every open item needs a status that distinguishes between active, waiting, and blocked. Not just open or closed. If something is waiting on a third party, that should be visible at a glance alongside who is accountable for following it up and when they last did.
  2. Dependencies need to be explicit. If item seven cannot move until item four resolves, that link should be documented. When item four gets resolved, the owner of item seven should know immediately.
  3. The partner should be able to see the real position without asking. A live tracker that reflects actual status means the update conversation shifts from "where are we" to "here is what needs a decision." That is a better use of everyone's time.

The Question Worth Asking

On your most active deal right now: which open items are genuinely moving, and which ones are waiting on something?

If you would have to ask around to find out, the bottlenecks are already hidden. And hidden bottlenecks compound before anyone thinks to look for them.

Read more resources here:

The Growth Memo.

Join our weekly newsletter for the latest insights and strategies to keep your deal team ahead of the competition.

Discover more from Growth Hub

Subscribe now to keep reading and get access to the full archive.

Continue reading